|

| |
|
|
|
|
|

|
|
20 Keys to Workplace Improvement |
|
Author: Iwao Kobayashi
20 Keys has helped many manufacturing companies integrate the top
manufacturing improvement methods into a coordinated system for drastic and
continual improvement in involvement, quality, and productivity. This
program provides the strategies necessary to achieve ambitious goals through
a five-level scoring system.
The revised edition is improved with upgraded criteria for the five-level
scoring system to guide your company to world-class status. New material and
updated layout make implementation even easier. Two valuable case studies
demonstrate effective use by both a Japanese company and an American
manufacturer.
Table of Contents
Key 1: Cleaning and Organizing
Key 2: Rationalizing the System/Management of Objectives
Key 3: Improving Team Activities
Key 4: Reducing Inventory (Shortening Lead Times)
Key 5: Quick Changeover Technology
Key 6: Manufacturing Value Analysis (Methods Improvement)
Key 7: Zero Monitor Manufacturing
Key 8: Coupled Manufacturing
Key 9: Maintaining Equipment
Key 10: Time Control and Commitment
Key 11: Quality Assurance System
Key 12: Developing Your Supplies
Key 13: Eliminating Waste (Treasure Map)
Key 14: Empowering Workers to Make Improvements
Key 15: Skill Versatility and Cross-Training
Key 16: Production Scheduling
Key 17: Efficiency Control
Key 18: Using Information Systems
Key 19: Conserving Energy and Materials
Key 20: Leading Technology and Site Technology
Implementing the 20 Keys
Appendixes
Pages: 302
ORDER CODE: PP1095B
BOOK
|
|
|